Barrhaven Interlock613 555-0105

Interlock repair and re-levelling

Lift the sunken or heaved section, fix the base, relay the same pavers and compact them level.

Sinking along the garage, a low spot that holds water, pavers pushed up by frost or tree roots: these are base problems. We lift the pavers in the affected area and stack them, dig out the failed bedding, add and compact granular base in thin layers, screed fresh bedding sand and relay the stones in their pattern.

Edges that have spread outward get new edge restraint. Without it the field slowly creeps and the joints open again.

Small spot repairs are often done in half a day. A full lift and relay of a driveway usually takes two to four days depending on size and access. Water should run away from the house when we're done, and we check it with a level, not by eye.

Send a photo of the sunken or heaved spot and get a written repair quote.

Call us 613 555-0105 Request a quote

All services

Interlock repair and re-levelling

Lift the sunken or heaved section, fix the base, relay the same pavers and compact them level.

New interlock driveways and walkways

Full excavation, a compacted granular base built for Ottawa frost, and pavers rated for vehicle traffic.

Polymeric sand and sealing

Clean out failed joints, refill with polymeric sand, and seal if you want colour and stain protection.

Retaining walls and steps

Rebuild leaning block walls and loose interlock steps with a proper footing and drainage behind them.